ETB&L FACILITY
JIS Rand Projects (Previously trading as MNP project Holdings (Pty) Ltd) was appointed under Khewija Engineering & Construction as the electrical consulting engineers of the Basic Design for the Sasol Energy Technology Fuels Blending & Logistics Facility Upgrade Project.
OUR SCOPE
Our scope included compiling electrical network studies, MCC feeder panels datasheets and single line diagrams, cable trenching and routing, earthing, LV transformer, LV switchgear, LV distribution boards, lighting design, cable trenching and routing and HVAC sizing calculations.
Year Completion: 2017
SOUTH 32 MOZAL SMELTER ELECTRICAL
We were appointed by CCI Growth Con as the electrical consulting engineers for the Mozal Maintenance Engineering project in Mozambique.
OUR SCOPE
The scope included the review of SAP Maintenance plans, reviewing equipment datebooks and Compiling Maintenance Task List for 132/22kV 31.5MVA Transformers, 132kV line Bays, 132kV Harmonic Filters and Power Factor Correction, 132kV Regulating Transformers, Rectifier Transformers, 22kV Switchgear, 3.3kV Switchgear, 400V Boards, DC Bus, Mini Substations, 22kV/400V Transformers, etc.
Year of Completion: 2015
30MW NOOITGEDACHT WIND FARM PROJECT
Previously trading as MNP Electrical Consulting Engineers CC, we were appointed by Mainstream Renewable Power Development to carryout preliminary connection studies for the 30MW Nooitgedacht Wind Farm.
OUR SCOPE
The scope of the studies was to find the best way to integrate the WEF generated power into the existing electrical network without compromising reliability and quality of supply in accordance with the NRS 048 and the Grid Codes. A pre-feasibility design included the collector system, step up substation and the connection point to Eskom network. The concept plant model was merged with a representation of Eskom network using power system simulation software called PowerFactory. The electrical network was simulated to ensure that the integration of Nooitgedacht WEF does not compromise the normal operation of the Eskom network and that it complies with the relevant grid codes as required by the South African Department of Energy’s Request for Qualification and Proposal document (RFP)[1].
Year of Completion: 2011
THINASONKE ELECTRIFICATION PROJECT
Previously trading as MNP project Holdings (Pty) Ltd we were appointed by Ekurhuleni Metropolitan Municipality to provide consulting services for the Electrification of 520 houses in Thinasonke human settlement.
OUR SCOPE
The scope included the preliminary design, detail design, documentation & tender. Construction monitoring, closure and completion of 11kV RMUs, 11kV mini substation, 11kV underground cabling, 400V overhead reticulation, 220V underground house connection and smart metering.
Year of Completion: 2016
LEEUDORINGSTAD 40MW SOLAR PV DESIGN
We were appointed as the electrical engineering consultants on behalf of The CAT Group by Zero Point Energy for the design of the 40MW Solar PV plant at Leeudoringstad in South Africa.
OUR SCOPE
The scope included the basic design, of 132/33kV Substation, 33kV Collector Substation, 33kV Collector Network, Earthing and auxiliaries.
Year of Completion: 2021
CONSTRUCTION-MOABVELD ACCESS ROAD
We were appointed by Exxarro for the construction of the 2km Moabsveld access road.
OUR SCOPE
The scope included construction of a 2km gravel access road.
Year of Completion: 2015